New front springs: being made by http://www.springcoil.co.uk and should be ready in the next week or so. Brake and fuel lines: just need to order these tomorrow, and if your looking for good prices on goodridge stuff these guys seem good, http://www.motoscope.co.uk/diy_hoses.htm. Petrol tank: still waiting for flange to be made, should be next week i hope. Front brakes: got the discs sorted, just need to have a bracket made up, might not get time this week to pop in to the engineering company so probably next week on those, found out that the master cylinder is too large at 1 inch, so ordering 7/8 this week to be brought back with stuff from the US. Water hoses: Mark at samco has been helpful, but has had no luch so need to phone and speak to him to see what sort of DIY setup i can make from stock stuff, but it will be a while before i get to that point.